Release Manager Team Meeting Minutes 20200512 Time: 9:15�C10:30 on Tuesday, May 12, 2020 Attendee: Release Manager Team Summary: Marlon Ma
Conclusion:��
һ����Sig��&Maintainner����ؼ�������ơ������Ͳ��Խ��ȡ��ؼ����Խ������£�
Related SIG team and maintainer aligns the progress of key feature Design, Coding, and Testing. The progress of key features is as follows��
n OS������������������ȷ������������1069������һ��601������������������������������50%��
OS Dependency Package: 1069 software packages to be supplemented have been sorted out, and the development of the first batch of 601 software packages has been started. The overall progress is 50%.
n ������ƽ̨���裺���������������Ͳ������������ƺ�ԭ����֤����������������������25%��
Package Management: Completed software package dependency management and patch tracing, completed design and prototype verification, and started development. The overall progress is 25%.
n ��������ƽ̨�����𡢵�������ּ���ɣ����뿪���Σ����ݴ�����Դ�빹�������������20%��lkp-test/��Դ�����������30%��
Community Testing Platform: The deployment and scheduling tasks are completed by level, and the development phase starts. Data processing and source code building: 20%; klp-test/open-source use case design: 30%.
n OS���������---������ȿ�ܼ�����2P MySQL���ݿ�mix����������4P MariaDB���ݿ����Ŀ���Ѵ�ɡ��û�̬aware��֪���Ⱥ��ں˹ؼ����ݽṹ�Ż������У�����������70%��
Domain-based scheduling framework technology: The 2P MySQL database mix scenario and Kunpeng 4P MariaDB database optimization objectives have been achieved. The user-mode aware awareness scheduling and kernel key data structure optimization are in progress. The overall progress is 70%.
n OS���������---A-Ops����(�ں����滻)�����������չ40%��Ӧ�ó����ڴ�PIN/�ָ��Լ�����ҳ����Ϣ������������ɴ��뿪�������������֤���ɿ��Լӹ̽Ρ�
A-Ops technology (hot kernel replacement): The overall requirement progress is 40%. The code development for application memory PIN/recovery and restart page information storage has been completed, and the test verification and reliability hardening phases have started.
���� �������⡣ 1��openEuler������Դ������SPEC�淶���� ���� Review the SPEC specifications of the open-source software package in the openEuler community. Wu Fengguang
2��ˮƽ����Ӧ������Maintainner��Ҫ��ȷ�� ���� The application software maintainer needs to be specified. Ma Liang
3��5.30ǰ���Maintainner��QA Team��ɹؼ����Դ��� �� ALL Before May 30, the related maintainers and QA team complete the lecture on key features. ALL
4�����������������Ԥ��5�µ�Ready����ҪЭ��һ�����Ϲ���Ա�� ���� The Lab required for community development is expected to be ready by the end of May. A material administrator needs to be coordinated. Ma Liang
5������ƽ̨�����Ŷ�Crystal���Ի����ϱ����������з��ա� �ſ��� The testing platform development team has a weak foundation in the Crystal language, which may cause risks in the short term. Du Kaitian
B/R Thanks ���� MarlonMa